McEwen Mining Inc.: Los Azules Copper Project Exploration Drilling Update


TORONTO, ONTARIO--(Marketwire - March 28, 2013) - McEwen Mining Inc. (NYSE:MUX)(TSX:MUX) is pleased to announce assay results for nine new core holes from the Los Azules copper project in San Juan Province, Argentina. Most importantly, drilling continues to intersect significant intercepts of high to medium grade copper mineralization over long intervals west of the original deposit. In addition, the mineralization has been successfully extended at depth.

Exploration Highlights

  • Drilling west of the resource has intersected high-grade copper mineralization in Hole 12114, returning 0.70% copper over 150 meters. This hole was located on the periphery of the resource and continues to extend what is becoming an important new parallel trend.

  • Hole 1297, which was drilled on the western edge of the resource, returned 0.50% copper over 414 meters, including 1.07% over 54 meters. In addition to Hole 12114, this hole helps demonstrate that there is excellent potential to increase the size of the resource.

  • Drilling below the previously known resource successfully extended the depth of the mineralization by over 300 meters in Hole 1295, returning 0.49% copper over 338.5 meters. This result was part of a longer intercept that went through two known zones of mineralization. The overall intercept from this hole was 0.51% copper over 618.5 meters.

  • The Company will incorporate these drill results plus an additional 3 holes not yet released into an updated resource estimate that is expected to be available by the end of May.

"These results continue to illustrate the growth potential of this world class copper asset. Los Azules is both large and high-grade, which makes it unique among the world's undeveloped projects," stated Rob McEwen, Chief Owner.

Table 1. Los Azules Exploration Highlights
Hole From
(m)
To
(m)
Thickness
(m)
Copper Grade
(%)
1295 426 1044.5 618.5 0.51
including 580 618 38 1.07
including 720 744 24 1.16
including 970 1044.5 74.5 0.61
1297 276 690 414 0.50
including 436 490 54 1.07
12114 224 374 150 0.70

This season was the first time that exploration had drilled below 700 meters. The discovery of deeper mineralization at the project has significantly expanded the potential to grow the resource. Drilling this season has continued to focus on expanding the resource with 15,800 meters completed to date. The drill results in this news release, plus 3 additional holes not yet finalized, will be incorporated into a new resource estimate that will be released by the end of May. This updated resource would form the basis of a new Preliminary Economic Assessment (PEA), which is due by the end of the third quarter 2013. Los Azules is one of the largest, highest grade copper-porphyry deposits not owned by a major base metal company.

A table of assay results is provided below in Table 2. A drill hole location map and cross sections of the Los Azules resource are provided below in Figures 1 to 4, respectively.

About the Los Azules Copper Project

Los Azules is a large copper porphyry system located in western San Juan Province within a belt of porphyry copper deposits that straddles the Chilean/Argentine border. This belt contains some of the world's largest copper deposits, including Codelco's El Teniente and Andina mines, Anglo American's Los Bronces mine, Antofagasta PLC's Los Pelambres mine and Xstrata's El Pachón project, among others.

The mineral resources for Los Azules were calculated in January 2013 and are summarized in the table below with a cut-off grade of 0.35% copper.

Mineral Resource
Category
Tonnes
(millions)
Copper
(%)
Contained Copper
(MM lbs)
Gold
grams/tonne
Silver
grams/tonne
Indicated 310 0.65 4.45 0.07 1.8
Inferred 1,302 0.49 13.95 0.06 2.0

About McEwen Mining (www.mcewenmining.com)

The goal of McEwen Mining is to qualify for inclusion in the S&P 500 by 2015 by creating a high growth gold producer focused in the Americas. McEwen Mining's principal assets consist of the San José mine in Santa Cruz, Argentina (49% interest); the El Gallo complex in Sinaloa, Mexico; the Gold Bar project in Nevada, US; the Los Azules project in San Juan, Argentina and a large portfolio of exploration properties in Argentina, Mexico and Nevada.

McEwen Mining has 296,024,859 shares issued and outstanding. Rob McEwen, Chairman, President and Chief Owner, owns 25% of the shares of the Company (assuming all outstanding Exchangeable Shares are exchanged for an equivalent amount of Common Shares). As of December 31, 2012, McEwen Mining had cash and liquid assets of approximately US$79 million and is debt free.

Technical Information

James K. Duff, Senior Consultant to the Company and a Registered Member in good standing of the Society for Mining, Metallurgy and Exploration, who is a Qualified Person as defined by National Instrument 43-101 ("NI 43-101") has reviewed and approved the technical contents of this news release. Bruce Davis, PhD, FAusIMM, who is a Qualified Person as defined by NI 43-101 and responsible for the quality control for the assaying of the Los Azules drill core has reviewed the assay quality control information. All samples were collected in accordance with industry standards. Split drill core samples were submitted to Alex Stewart International laboratory in Mendoza, Argentina for fire assay and ICP analysis. Accuracy of results is verified through the systematic inclusion of standards, blanks and duplicate samples.

For additional information about the Los Azules project see the Technical Report titled "Los Azules Porphyry Copper Project, San Juan Province, Argentina" dated August 1, 2012, with an effective date of June 15, 2012, prepared by D. Ernest Winkler, P.Eng, Robert Sim, P.Geo, Bruce Davis, PhD, FAusIMM and James K. Duff, P.Geo, all of whom are qualified persons and all of whom are independent of McEwen Mining, each as defined by NI 43-101. The foregoing report is available under the Corporation's profile on SEDAR (www.sedar.com).

The mineral resource estimate referenced in this news release was prepared in January 2013 by Robert Sim, P.Geo. and Bruce Davis, PhD, FAusIMM, each a qualified person and independent of McEwen Mining, each as defined by NI 43-101 and first disclosed in the Corporation's news release dated February 5, 2013 titled "McEwen Mining Continues to Expand Los Azules' Large, High-Grade, Mineral Resource.

Cautionary Note to U.S. Investors

McEwen Mining reports its resource estimates in accordance with standards of the Canadian Institute of Mining, Metallurgy and Petroleum referred to in Canadian National Instrument 43-101 (NI 43-101). These standards are different from the standards generally permitted in reports filed with the SEC. Under NI 43-101, McEwen Mining reports measured, indicated and inferred resources, measurements which are generally not permitted in filings made with the SEC. According to Canadian NI 43-101 criteria, the estimation of measured resources and indicated resources involve greater uncertainty as to their economic feasibility than the estimation of proven and probable reserves. Under SEC Industry Guide 7 criteria, measured, indicated and inferred resources are considered Mineralized Material. The SEC considers that in addition to greater uncertainty as to the economic feasibility of Mineralized Material compared to proven and probable reserves, there is also greater uncertainty as to the existence of Mineralized Material. U.S. investors are cautioned not to assume that measured or indicated resources will be converted into economically mineable reserves. The estimation of inferred resources involves far greater uncertainty as to their existence and economic viability than the estimation of other categories of resources.

Caution Concerning Forward-Looking Statements

This press release contains certain forward-looking statements and information, including "forward-looking statements" within the meaning of the Private Securities Litigation Reform Act of 1995. The forward-looking statements and information expressed, as at the date of this press release, McEwen Mining Inc.'s (the "Company") estimates, forecasts, projections, expectations or beliefs as to future events and results. Forward-looking statements and information are necessarily based upon a number of estimates and assumptions that, while considered reasonable by management, are inherently subject to significant business, economic, political and competitive uncertainties, risks and contingencies, and there can be no assurance that such statements and information will prove to be accurate. Therefore, actual results and future events could differ materially from those anticipated in such statements and information. Risks and uncertainties that could cause results or future events to differ materially from current expectations expressed or implied by the forward-looking statements and information include, but are not limited to, risks related to the cost of transferring or otherwise allocating funds between operating jurisdictions, factors associated with fluctuations in the market price of precious metals, mining industry risks, political, economic, social and security risks associated with foreign operations, risks associated with the construction and permitting of mining operations and commencement of production and the projected costs thereof, risks related to litigation, property title, the state of the capital markets, environmental risks and hazards, uncertainty as to calculation of mineral resources and reserves and other risks. Readers should not place undue reliance on forward-looking statements or information included herein, which speak only as of the date hereof. The Company undertakes no obligation to reissue or update forward-looking statements or information as a result of new information or events after the date hereof except as may be required by law. See McEwen Mining's Annual Report on Form 10-K for the fiscal year ended December 31, 2012 and other filings with the Securities and Exchange Commission, under the caption "Risk Factors", for additional information on risks, uncertainties and other factors relating to the forward-looking statements and information regarding the Company. All forward-looking statements and information made in this news release are qualified by this cautionary statement.

Table 2 - Summary of Drill Hole Results
Hole Northing Easting Dip From (m) To
(m)
Thickness
(m)
Cu
(%)
Zone
1) 1290 6559000 2383750 90° 0 61 61 - Overburden
61 142 81 0.02 Leached oxide cap
142 152 10 0.06 Mixed oxide
152 366 214 0.24 Partially enriched with weak chalcopyrite and chalcocite
Includes 30m at 0.41% Cu from 288m to 318m
366 757.5 389.5 0.13 Weak primary with chalcopyrite
Step-out hole completed to target depth. Average core recovery was 93%.
2) 1293 6559621 2383360 90° 0 61 61 - Overburden
61 74.5 13.5 - Caving - no sample
74.5 106 31.5 0.18 Partially enriched with weak chalcopyrite and chalcocite
Infill hole lost before reaching target depth. Average core recovery was 50%.
3) 1295 6558598 2382993 90° 0 67 67 - Overburden
67 80 13 0.07 Leached oxide cap
80 112 32 0.31 Partially enriched with calcocite and chalcopyrite
112 140 28 0.18 Primary chalcopyrite
140 164 24 0.24 Partially enriched with chalcopyrite and chalcocite
164 426 262 0.22 Primary chalcopyrite and bornite
426 1044.5 618.5 0.51 Primary chalcopyrite and bornite
Includes 38m at 1.07% Cu from 580m to 618m,
And 24m of 1.16% Cu from 720m to 744m,
And 74.5m of 0.61% Cu from 970m to 1044.5m
Twin of hole T-01 (drilled in 2010) completed to target depth. Average core recovery was 99%.
4) 1296 6558158 2323223 90° 0 60.2 60.2 - Overburden
60.2 66.2 4 0.03 Leached oxide cap
66.2 72.7 6.5 - Caving - no sample
72.7 156 83.3 0.25 Primary chalcopyrite
156 244 88 0.92 Primary chalcopyrite and chalcocite
244 523.2 279.2 0.24 Primary chalcopyrite and bornite
Reattempt of hole 12101 lost before reaching target depth. Average core recovery was 86%.
5) 1297 6559203 2382889 90° 0 69 69 - Overburden
69 72 3 0.03 Mixed oxide
72 218 146 0.18 Partially enriched with chalcopyrite and chalcocite
218 276 58 0.18 Primary chalcopyrite and bornite
276 690 414 0.50 Primary chalcopyrite and bornite
Includes 54m at 1.07% Cu from 436m to 490m
690 980.8 290.8 0.23 Primary chalcopyrite and bornite
Step-out hole completed to target depth. Average core recovery was 97%.
6) 12104 6558803 2383200 90° 0 114 114 - Overburden
114 172 58 0.18 Partially enriched with chalcocite and chalcocite
172 270 98 0.23 Primary chalcopyrite and bornite
270 374 104 0.39 Primary chalcopyrite and bornite
374 706.4 332.4 0.25 Primary chalcopyrite and bornite
Infill hole completed to target depth. Average core recovery was 92%.
7) 12106 6559621 2383360 90° 0 79 79 - Overburden
79 106 27 0.02 Leached oxide cap
106 222 116 1.01 Enriched with chalcocite and chalcopyrite
222 428 206 0.55 Partially enriched with chalcopyrite and chalcocite
428 496 68 1.18 Partially enriched with chalcopyrite and chalcocite
496 866.4 370.4 0.30 Primary chalcopyrite and bornite
Offset hole 1048 (drilled in 2010) completed to target depth. Average core recovery was 91%.
8) 12100 6559046 2383378 90° 0 30 30 - Overburden
30 104 74 0.02 Leached oxide cap
104 136 32 0.30 Mixed oxide
136 222 86 0.55 Secondary chalcocite with pyrite
222 282 60 0.29 Partially enriched with pyrite, chalcopyrite and chalcocite
282 751.3 469.3 0.21 Primary pyrite, chalcopyrite and bornite
Infill hole completed to target depth. Average core recovery was 97%.
9) 12114 6559820 2382635 90° 0 101 101 - Overburden
101 138 37 0.09 Mixed oxide
138 174 36 0.16 Partially enriched with pyrite and chalcocite
174 224 50 0.39 Enriched with chalcocite and chalcopyrite
224 374 150 0.70 Enriched with chalcocite and chalcopyrite
374 814.5 440.5 0.22 Primary pyrite, chalcopyrite and bornite
Step-out hole completed to target depth. Average core recovery was 95%.

To view the figures associated with this release, please visit the following link: http://media3.marketwire.com/docs/MUX328_maps.pdf.

The NYSE and TSX have not reviewed and do not accept responsibility for the adequacy or accuracy of the contents of this news release, which has been prepared by management of McEwen Mining Inc.

Contact Information:

McEwen Mining Inc.
Jenya Meshcheryakova
Investor Relations
(647) 258-0395 ext 410 or Toll Free: (866) 441-0690
(647) 258-0408 (FAX)

Mailing Address
McEwen Mining Inc.
181 Bay Street Suite 4750
Toronto, ON M5J 2T3
PO box 792
info@mcewenmining.com

Facebook: www.facebook.com/mcewenrob
Twitter: www.twitter.com/mcewenmining
Store: www.mcewenmining.com/store